We Are Leading In Aluminium Formwork Solutions - Find us on Map

  • Certified Company

    ISO 9001:2016

Contact Us

+91 81601 29997

Quality

To beat your competition, make good
quality your mission.

Awesome Image

It can be used repeatedly with low average use-cost:

Aluminium panels can be re-used more than 200 times unlike conventional formwork which serves only a maximum of 50 to 60 repetitions.

Construction is convenient and effective:

The assembly of aluminium formwork is simple and convenient the average weight is 24kg/m2• A skilled installation worker can install 20-30 square meters per day.

Saving on Construction Time:

Aluminium formwork system is a fast assembly and removal system that shorten the construction period and save the administration cost. A set of formworks can build one storey in every four days under a normative construction

Wide Application:

Aluminium formwork can be used for wall, slab,column, beam, stairs, windows etc.

High Salvage Value:

The salvage value of the aluminium alloy in formwork system is very high when scrapped after reaching full repetition limit.

No construction garbage on site:

All parts of aluminium formwork are reusable, and there is no garbage on site after the formworks are removed to ensure the construction environment is safe, clean and tidy.

Flexibility:

Aluminium alloy construction formwork comes in different standard sized panels and is flexible to assemble according to the requirement of the respective projects. Only 10-15% of non-standard panels need to be replaced when the formwork is reused for another project, thereby reducing the cost.

Carbon emission reduction:

Many developed countries have already stipulated that only renewable formwork should be used in construction projects as opposed to wooden formwork.

Good stability, high bearing capacity:

Once the system is assembled, it will form a complete framework with very good stability and bearing capacity ofup to 60 KN per square meter.

Convenient support system:

In traditional method of formwork construction technology, the platform generally requires full framing with higher cost whereas the support for the aluminium formwork are relatively less (spacing between each independent support is 1350 mm) thereby providing larger work space, personnel access and easy materials handling at site.

Excellent surface finish:

The quality of concrete surface is smooth after removing the aluminium formwork and basically meets the requirement offinished and exposed concrete. Plastering is not required, thereby resulting in cost reduction.